What is a sprint

In Agile development, a Sprint is a fixed timebox during which a team works to complete a set of prioritized tasks and deliver incremental value. Understanding this concept is key to efficient Sprint planning and execution.

A Sprint is a set period of time during which specific work has to be completed and made ready for review.

The image defines a "Sprint" as a set period of time for completing specific work, accompanied by an illustration of a stopwatch with arrows.

The Baker Analogy

Consider a baker who aims to produce quality loaves of bread. His workflow includes:

  1. Import good-quality wheat
  2. Store the wheat properly
  3. Ferment the dough
  4. Prepare the dough
  5. Bake the bread

He prioritizes tasks based on the value they deliver:

The image shows a list of tasks with a priority ranking, from "Importing" as the highest priority to "Baking" as the least priority, alongside an icon of a checklist labeled "Tasks."

Although every step is required, importing top-grade wheat has the greatest impact on the final product. When the baker packages this prioritized workflow into a fixed timebox (for example, one morning), that timebox becomes his Sprint.

Translating to DevOps

A DevOps team operates similarly, with:

  • A desired outcome (feature, bug fix, release)
  • A backlog of tasks ranked by priority

The image shows a task list with a priority order, ranging from "Importing" as the highest priority to "Baking" as the least priority, alongside icons representing tasks and time management.

In each Sprint, the team:

  1. Defines the scope (what will be done)
  2. Executes the selected tasks within a fixed timeframe

Note

Timeboxing a Sprint helps teams focus on delivering the highest-value items and avoids scope creep.

Stages of a Sprint

Below is an outline of the four core stages in a Sprint cycle:

The image outlines the stages of sprint planning, including Backlog Grooming, Sprint Planning, Sprint, and Sprint Review, with brief descriptions for each stage.

StagePurposeKey Activities
Backlog GroomingRefine and prioritize work itemsClarify requirements, estimate effort, rank by business value.
Sprint PlanningSelect tasks matching team capacityCommit to items for the upcoming Sprint based on velocity.
Sprint ExecutionBuild and deliver functionalityComplete tasks, handle blockers, collaborate continuously.
Sprint ReviewValidate and demonstrate completed workShowcase deliverables, gather feedback, update backlog.

1. Backlog Grooming

  • Curate and refine the product backlog.
  • Assign priority and ensure each item has clear acceptance criteria.

2. Sprint Planning

  • Choose backlog items that match the team’s capacity (e.g., 3 engineers over 2 weeks).
  • Break down tasks further if needed.

3. Sprint Execution

  • Work within the agreed timebox (commonly 1–2 weeks).
  • Warning

    Do not add new tasks mid-Sprint—this disrupts focus and the planned scope.

  • Escalate blockers to the Product Owner or Scrum Master for prompt resolution.

4. Sprint Review

  • Demonstrate completed work to stakeholders.
  • Verify each task meets the acceptance criteria and collect feedback for future Sprints.

All of this aligns with the principles of Agile software development. Some teams may opt for Kanban or other frameworks, but the Sprint-centric approach is widely adopted for its predictability and focus.